对浙江某金精矿氰化浸出工艺进行改进,将贵液直接返回磨机边磨边浸,在富氧条件下直接全泥氰化浸出金,含氰污水全部返回流程。实践结果表明:工艺改进后不仅大大缩短了浸出时间,而且金、银总回收率均提高了5%以上,并有较好的环境效益。
Abstract:The full-slime cyanidation leaching process for a gold concentrate in Zhejiang is improved.Pregnant solution is returned to grind ore,gold is leached at the same time of milling.At rich-oxygen conditions,the concentrate is directly full-slime cyanidation leached,and all of effluent containing cyanide is recycled.The practice result shows that leaching time is significantly shortened,total recovery of gold and silver increased over 5% than original process,and environmental benefit is good.
[1]陈世溶.机械活化及其在浸出过程中的应用[J].上海有色金属,1998,19(2):91-96.
[2]叶跃威,何斌林.用全泥氰化法从浮选金精矿中回收金[J].湿法冶金,2009,28(1):18-20.
[3]吕谦,张佩璜,吴敏杰.边磨边浸氰化提金新工艺的研究[M]//中国科学院科技领导小组办公室.黄金提取研究.北京:科学出版社,1992:100.
[4]王丽莉.富氧氰化浸金作用机理及应用[J].有色金属,2000(4):18-21.
[5]李文建.富氧浸出提金实践[J].黄金,1997,18(12):41-44.
基本信息:
DOI:10.13355/j.cnki.sfyj.2012.02.013
中图分类号:TF803.21
引用信息:
[1]温胜来,周源.浙江某金矿全泥氰化浸出试验研究[J].湿法冶金,2012,31(02):103-105.DOI:10.13355/j.cnki.sfyj.2012.02.013.
基金信息: